CORE Natural Gas, Kermit, TX
Three NuPresto packages, trailer throughput from about 40 to about 100 per day.
Read the case study
From a 30,000 GPD LNG plant to multi-unit compressor stations, utility trailer fleets and FEED studies on three continents. Filter by sector to see what we have built.

Three NuPresto packages, trailer throughput from about 40 to about 100 per day.
Read the case study
A 30,000 GPD liquefaction plant designed, built, commissioned and operated by the NuBlu team. Running since 2017.
Read the case study
Full EPC of a 5.5 MMSCFD CNG mother station, from pipeline interconnect to power upgrade.
Read the case studyNuPresto 400 CNG compression for a new Nebraska site, delivered and started up by the NuBlu team.
Follow-on NuPresto 400 installation for a repeat virtual pipeline customer, building on the three-unit Kermit site.
Virtual pipeline trailers with glycol bath and catalytic pressure reduction for an Ohio gas distribution utility.
Multiple VPT systems for gas distribution with integrated PRS up to 0.35 MMSCFD across varying inlet pressures. Type IV cylinders, 3,600 psig.
Three compressor stations tripled trailer throughput from about 40 to about 100 per day. 3 MMSCFD each, 850 psig suction, 4,100 psig discharge.
Replaced three legacy 4-stage units with two NuPresto packages and doubled station flow. Fully automated trailer filling.
Up to 8,000 MSCF/d glycol bath PRS with PLC controls, JT-mitigation heating and integration with VPT trailers and daughter stations.
25 TPD modular LNG on a single mixed refrigerant cycle, variable feed gas, rapid deployment. Patent issued May 2026. Productized through the NuCryo joint venture.
3 MMSCFD CNG compressor package (800 to 4,000 psig) and 8,000 MSCF/d pressure reduction system, the start of the standardized NuPresto and PRS lines.
Fuel gas system for one to six 1.6 MW reciprocating engine gensets, from pipeline tap to generator connection. Pipeline gas at 1,000 psig regulated down to 5 psig for a six-generator, 11.4 MW Caterpillar power plant near Kermit. Built to ASME code and installed in one week.
Fuel gas supply for three industrial dryers at a sand plant in Poteet, Texas: pipeline gas at 300 psig regulated to 75 psig, 3.1 miles of 6-inch HDPE supply line and a 255-foot directional bore under existing infrastructure. ASME and MSHA compliant, completed in one month.
100 TPD in two 50 TPD trains. Inlet metering, DeOx, amine, dehydration and SepraSIV, NuBlu liquefaction. Client confidential.
Full EPC: pipeline, facility, power system upgrade and regulatory guidance for the pipeline interconnect.
Inlet metering, DeOx, amine, dehydration and SepraSIV, NuBlu liquefaction, LNG storage and pumps. Severe-weather design with all sensitive equipment enclosed. Client confidential.
18,000 GPD modular LNG plant in a five-skid design, specific power 575 to 650 kWh per tonne, designed for roughly two-week deployment. The basis for today's mLNG platform.
Upgraded the LNG plant's gas pretreatment unit to UOP SepraSIV molecular sieve technology to eliminate benzene freeze-up.
Custom facility to drain, wash and dry lube oil rail cars at one car per hour including switching. Self-positioning, heated water, waste transfer and interlocks. Approved by Exxon on first inspection.
30,000 GPD liquefaction plant: new technology commercialization, process development, owner's engineer, procurement and construction. PHMSA and DOT audit passed. Operating since December 2017.
No projects in this category yet.
Send us your suction pressure, flow target, outlet pressure or project scope. We come back with a configured package, usually within one business day.