PRS-G series
Glycol bath heater. High-volume, continuous duty with reliable heating.

NuBlu pressure reduction systems take gas straight from CNG trailers down to the pressure the site needs, and put back the heat the pressure drop takes out. Pick the heat source for the site, then the capacity: glycol bath for high volume, catalytic for compact flame-free sites, electric where no flame or catalyst is allowed. The flagship PRS-G8000 delivers up to 8,000 MSCF/d.
CNG delivered from trailers arrives at high pressure and drops sharply on its way to site pressure. That pressure drop cools the gas fast enough to freeze regulators, valves and downstream equipment if the heat is not put back in. Every NuBlu PRS pairs two-stage pressure regulation with a heater sized for the flow, so the gas stays above hydrate and freeze conditions through the cuts.
Three heat sources cover every site. The PRS-G series uses a glycol bath heater for high-volume continuous delivery, with redundant control valve and regulator circuits so the unit keeps flowing through maintenance. The PRS-C series uses a flame-free catalytic heater for compact and populated sites. The PRS-E series heats electrically for utility and LDC sites where fired and catalytic equipment are excluded. All are built, wired and FAT-tested in our shop.
| PRS-G8000 | Glycol bath, 2 MMBTU/hr, 500 to 8,000 MSCF/d, trailer mounted. Product page |
|---|---|
| PRS-G4000 | Glycol bath, 1 MMBTU/hr, up to 4,000 MSCF/d. Product page |
| PRS-G2000 | Glycol bath, 0.5 MMBTU/hr, up to 2,000 MSCF/d. Product page |
| PRS-G750 | Glycol bath, about 190 MBTU/hr, up to 750 MSCF/d. Product page |
| PRS-C720 | Catalytic, flame-free, up to 720 MSCF/d. Product page |
| PRS-C360 | Catalytic, flame-free, up to 360 MSCF/d. Product page |
| PRS-E450 | Electric, 2 x 27 kW, 450 MSCF/d. Product page |
| Inlet pressure | Up to 4,200 psig (CNG trailer service); PRS-E450 to 4,700 psig |
| Outlet pressure | User defined, set per application; as low as 5 psig on catalytic units |
| Pressure control | Two-stage: control valve or regulator first cut, regulator second cut, heating ahead of the cuts; redundant circuits on the PRS-G series |
| Automation | PLC with HMI and remote monitoring via Ewon; optional solar and battery power on catalytic units |
| Design standards | ASME Section VIII Div. 1, B31.3, NEC, NFPA |
Flows are stated in MSCF/d: the model number is the rated flow. Final outlet pressure, valve trim and PSV settings are configured to your application.
Glycol bath where the volume is high, catalytic where flame is unwelcome, electric where neither flame nor catalyst is allowed. One family, one control philosophy.
PRS-G units cut pressure through two parallel control valve circuits and two parallel regulator circuits. Run on one, service the other, no shutdown for routine maintenance.
PRS-G8000 means 8,000 MSCF/d. Every model is rated in MSCF/d so sizing a site is arithmetic.
Trailer or skid mounted, designed to move between sites and operate wherever CNG trailers are staged.
PLC-based control with HMI and remote monitoring. Trailer swap logic, multi-trailer mode and start-up sequencing handled in software.
Final assembly, FAT, loop checks and HMI commissioning happen in our shop. Issues get caught in the shop, not on your site.
Every PRS ships with a complete engineering package: P&IDs, GA drawings, electrical load lists and a full O&M manual. Critical spares, including control valve trims and instrumentation, are stocked at our shop for fast response.
Field service, troubleshooting and remote diagnostics are handled by the same team that designed and built the unit.
Glycol bath heater. High-volume, continuous duty with reliable heating.
Catalytic heater. Flame-free, compact, no separate fuel hookup.
Electric heater. Utility and LDC sites where open flame is not an option.
Send us your suction pressure, flow target, outlet pressure or project scope. We come back with a configured package, usually within one business day.