NuPresto 400
2-stage CNG reciprocating compressor package on the Fornovo Gas DA300 frame. 400 HP, up to 3.64 MMSCFD, 4,200 psig discharge. 3- and 4-stage variants cover suction from 40 psig.
- 550 to 900 psig in
- 4,200 psig out
- Non-lube cylinders

Standardized CNG compression, pressure reduction, virtual pipeline and micro-scale LNG equipment, plus the engineering and construction for the gas facilities around it. Every package is assembled and FAT-tested before it ships.
Standardized CNG compressors, pressure reduction systems, virtual pipeline trailers, mobile fueling and hydraulic boosters, and micro-scale LNG packages. Same proven design across every unit, predictable lead times and spares stocked in Texas.
Browse the catalog
Process engineering, FEED and detailed design, custom compressor packaging, procurement and industrial construction for CNG stations, LNG facilities, fuel gas systems and compression sites. Delivered as EPC, EPCM or equipment plus commissioning, up to $50MM per project.
See how we deliver
Compression, pressure reduction, storage and transport, fueling and liquefaction. Pick by inlet pressure, flow and site, and we size the rest.

2-stage CNG reciprocating compressor package on the Fornovo Gas DA300 frame. 400 HP, up to 3.64 MMSCFD, 4,200 psig discharge. 3- and 4-stage variants cover suction from 40 psig.

20-ft container-based fueling package built around a 125 HP, 2-stage hydraulic booster. Pulls trailers down to low residual pressure, unlimited start and stop cycles, onboard cascade storage and Coriolis metering.

Trailer pressure in, site pressure out. Glycol bath, catalytic or electric heated PRS from 360 to 8,000 MSCF/d, with redundant control valve circuits and full PLC automation on the flagship PRS-G8000.

CNG storage and 2-stage pressure reduction in one trailer. The bumper-pull VPT-64 for light-duty and remote sites, the DOT highway-rated VPT-128 for continuous delivery. Type IV cylinders, 4,000 psig.

Hydraulic booster packages in a 10 ft or 20 ft Connex with the air cooler outside. From the low-speed 60 HP B60 for trailer testing and decanting to the dual 2B120 for station-like fueling throughput, all up to 4,200 psig.

Patented 25 tonne-per-day single mixed refrigerant liquefier on two truckable skids. About 420 kWh per tonne, full nameplate at 100 °F ambient, LNG at 1 barg for denser storage.
The products are designed as a system. A NuPresto compressor fills the trailers, the trailers carry gas where there is no pipeline, and a PRS or mobile fueler puts it to work at site pressure.
NuPresto 400 takes pipeline, wellhead or RNG gas from as low as 40 psig up to 4,200 psig CNG fill pressure.
VPT-64 and VPT-128 trailers carry 64,000 to 128,000 SCF behind a pickup or a Class 8 tractor.
PRS-G, PRS-C and PRS-E units heat and regulate trailer gas to the pressure the site needs, from 360 to 8,000 MSCF/d.
Mobile fueling and hydraulic boosters dispense to fleets. µSMR and mLNG turn the same gas into LNG where the molecule has to travel farther.
Product buyers and facility owners across the natural gas value chain, from utilities to well sites.
Mother stations, trailer fleets and daughter stations for operators moving gas by road. Compression that fills trailers fast and PRS that empties them cleanly.
Trailer-fed supplemental supply, peak shaving and pipeline pack-up for LDCs, including electric-heated PRS where open flame is not an option.
High-flow PRS and trailers for dual-fuel and e-frac fleets, drilling rigs and remote power, built for the duty cycles those operations demand.
3- and 4-stage compression off dryer outlets at 40 to 600 psig, RNG-to-CNG for trucking or injection, and offload and dispensing at interconnects.
Container-based mobile fueling systems and hydraulic boosters that turn any yard into a CNG station without permanent infrastructure.
Micro-scale liquefaction and fuel gas systems for sites, mines, data centers and marine users beyond the grid and the pipeline.
A few recent deliveries from a project history that runs from a 30,000 GPD LNG plant to multi-unit compressor stations.

Three NuPresto compressor packages took trailer throughput from about 40 to about 100 trailers per day. 3 MMSCFD each, 850 psig suction, 4,100 psig discharge.
Read the case study
A 30,000 GPD liquefaction plant the team designed, built, commissioned and ran. Operating since December 2017, sold to Stabilis in 2021, still producing.
Read the case study
Full EPC of a 5.5 MMSCFD CNG mother station: pipeline interconnect, facility, power system upgrade and the regulatory work to get it on line.
Read the case studyEquipment and facilities delivered for
Process engineering, FEED and detailed design, procurement, industrial construction and start-up for CNG stations, LNG plants, fuel gas systems and compression sites.

Send us your suction pressure, flow target, outlet pressure or project scope. We come back with a configured package, usually within one business day.