PRS-G series
Glycol bath heater. High-volume, continuous duty with reliable heating.

Trailer pressure in, site pressure out, built for high-volume CNG. NuBlu Energy's flagship glycol bath pressure reduction system takes gas straight from CNG trailers down to user-defined site pressure with the heating capacity, redundancy and automation needed for continuous delivery up to 8,000 MSCF/d.
CNG delivered from trailers arrives at high pressure and drops sharply on its way to site pressure. That pressure drop cools the gas fast enough to freeze regulators, valves and downstream equipment if the heat is not put back in. The PRS-G8000 puts it back with a 2 MMBTU/hr glycol bath heater sized for continuous delivery up to 8,000 MSCF/d.
Redundant control valve (stage 1) and Mooney regulator (stage 2) circuits keep gas flowing even during maintenance. User-definable outlet PSVs and onboard fuel gas mean the unit ships ready to drop on site, hook up and run. Trailer swap logic, multi-trailer mode and start-up sequencing are handled in software.
| Pressure cuts | 2-stage standard (3 and 4 stages optional) |
|---|---|
| Heater type | Glycol bath, 2 MMBTU/hr |
| Flow rate | 500 to 8,000 MSCF/d |
| Inlet pressure | Up to 4,200 psig (CNG trailer service) |
| Outlet pressure | User defined, set per application |
| Pressure control | Redundant control valve circuits (stage 1), redundant Mooney regulator circuits (stage 2) |
| Turndown | Large turndown, extremely low delta-P |
| Overpressure protection | User-definable outlet PSVs |
| Fuel gas | Onboard fuel gas system for the heater burner |
| Automation | Fully automated PLC with HMI, remote monitoring via Ewon |
| Footprint | Trailer mounted, under 30 ft, about 43,000 lb |
| Design standards | ASME Section VIII Div. 1, B31.3, NEC, NFPA |
| Skid | Single skid, fully assembled and FAT-tested in shop |
Final outlet pressure, valve trim and PSV settings are configured to your application. Contact engineering for a sized proposal.
2 MMBTU/hr glycol bath heater sized for continuous 8,000 MSCF/d delivery. Keeps gas above hydrate and freeze conditions even during sustained high-flow operation.
First-stage cut by two parallel control valve circuits, second-stage cut by two parallel Mooney regulator circuits. Run on one, service the other. No shutdown for routine maintenance.
Trailer mounted and under 30 ft, designed to move between sites and operate wherever CNG trailers are staged.
PLC-based control with HMI and remote monitoring via Ewon. Trailer swap logic, multi-trailer mode and start-up sequencing handled in software.
Self-supplied fuel gas for the heater burner. No external fuel hookup required to start producing heat.
Final assembly, FAT, loop checks and HMI commissioning happen in our shop. Issues get caught in the shop, not on your site.
Every PRS-G8000 ships with a complete engineering package: P&IDs, GA drawings, electrical load lists and a full O&M manual. Critical spares, including control valve trims and instrumentation, are stocked at our shop for fast response.
Field service, troubleshooting and remote diagnostics are handled by the same team that designed and built the unit.
Glycol bath heater. High-volume, continuous duty with reliable heating.
Catalytic heater. Flame-free, compact, no separate fuel hookup.
Electric heater. Utility and LDC sites where open flame is not an option.
Send us your suction pressure, flow target, outlet pressure or project scope. We come back with a configured package, usually within one business day.